Build public EV charging stations
Turnkey public charging station installations — from highway corridors to urban locations. Complete infrastructure, permits, and CMS included.
Turnkey station delivery
Everything from site selection to CMS launch — a complete public charging station delivered ready to operate.
Location Selection Support
Data-driven site selection based on traffic patterns, EV density, grid proximity, and commercial viability analysis.
Power Infrastructure
Complete power setup — transformer installation, HT/LT panels, cabling, earthing, and metering for your station.
Charger Installation (AC + DC Fast)
Professional installation of AC slow chargers and DC fast chargers with all necessary connectors and safety systems.
Canopy & Civil Works Coordination
Coordination of canopy structures, flooring, drainage, lighting, and all civil works for a professional station.
Payment Kiosk & Signage
Payment terminals, QR-based UPI, RFID readers, highway-visible signage, and wayfinding for driver convenience.
CMS Setup with Driver App
Full charging management platform with real-time station monitoring, driver-facing app, and revenue analytics.
From site to station
A structured process covering every phase of public charging station development and launch.
Site Finalization
Select and finalize the station location based on feasibility study, land agreements, and traffic analysis.
Permits & Power
Obtain all required permits, electricity connection approvals, and regulatory clearances for your station.
Civil Works
Foundation, canopy, flooring, drainage, electrical room, and all civil infrastructure construction.
Charger Installation
Install and commission all AC and DC chargers, payment systems, signage, and safety equipment.
Testing & Launch
End-to-end testing, CMS go-live, driver app activation, and public launch of your charging station.
Every type of public station
We design and build public charging stations tailored to the location, use case, and revenue model.
Highway Fast-Charging
DC 60–360kWHigh-power DC fast chargers along national and state highways for long-distance EV travel. 15-45 minute charging stops.
Urban Charging Hubs
Mixed AC + DCMulti-charger hubs in urban centers combining AC destination charging with DC fast chargers for quick top-ups.
Destination Charging
AC 7–22kWAC chargers at malls, hotels, restaurants, and leisure destinations where vehicles are parked for extended periods.
Petrol Pump Conversions
DC 30–150kWTransform existing petrol stations into hybrid fuel + EV charging stations. Leverage existing locations and footfall.
Start Your Public Station
From site selection to station launch — our team will guide you through every step of building a profitable public EV charging station.